1.8 Success Criteria & KPIs
| Item |
Details |
| Document Version |
1.0 |
| Last Updated |
December 2025 |
| Author |
Network Architecture Team |
| Organization |
Abhavtech.com |
| Classification |
Internal Use Only |
1.8.1 Overview
This section defines the success criteria and Key Performance Indicators (KPIs) for the SD-WAN migration project. These metrics establish measurable outcomes that will be used to evaluate project success at each phase and final delivery.
Success Framework
- Technical Success: Network performance meets or exceeds targets
- Operational Success: Simplified operations, reduced incidents
- Financial Success: Cost savings realized as projected
- Business Success: User satisfaction and productivity improved
1.8.2 Technical Success Criteria
| KPI |
Baseline |
Target |
Measurement Method |
| WAN Availability |
99.92% |
99.99% |
vManage uptime reports |
| Regional Latency |
25 ms |
<20 ms |
vAnalytics measurements |
| Inter-region Latency |
175 ms |
<160 ms |
BFD probes |
| Jitter |
15 ms |
<10 ms |
vManage SLA metrics |
| Packet Loss |
0.15% |
<0.05% |
Real-time monitoring |
| Failover Time |
N/A |
<1 second |
Automated testing |
| Application |
Current |
Target |
Acceptance |
| Voice MOS |
3.8 |
>4.2 |
95% of calls |
| Video Quality |
Variable |
1080p sustained |
90% of sessions |
| SAP Response |
2.5 sec |
<2 sec |
95th percentile |
| O365 Latency |
85-120 ms |
<50 ms |
All sites |
| Webex Quality |
3.5 |
>4.0 |
95% of meetings |
Success Criteria Visualization
PERFORMANCE SUCCESS DASHBOARD
═══════════════════════════════════════════════════════════════
AVAILABILITY LATENCY QUALITY
┌─────────┐ ┌─────────┐ ┌─────────┐
│ Target: │ │ Target: │ │ Target: │
│ 99.99% │ │ <20ms │ │ >4.2 │
│ │ │ │ │ MOS │
│ ████ │ │ ████ │ │ ████ │
│ ████ │ │ ████ │ │ ████ │
│ ████ │ │ ████ │ │ ████ │
│ ████ │ │ ██░░ │ │ ███░ │
│ ████ │ │ ░░░░ │ │ ░░░░ │
│ 99.99% │ │ 18ms │ │ 4.3 │
└─────────┘ └─────────┘ └─────────┘
✅ PASS ✅ PASS ✅ PASS
═══════════════════════════════════════════════════════════════
1.8.3 Operational Success Criteria
Operational Efficiency KPIs
| KPI |
Baseline |
Target |
Measurement |
| Mean Time to Repair (MTTR) |
4 hours |
<1 hour |
Incident tickets |
| Change Implementation Time |
2 weeks |
<1 day |
Change records |
| Configuration Errors |
15/month |
<3/month |
Audit logs |
| NOC Escalations |
45/month |
<15/month |
Ticket analysis |
| Automation Rate |
20% |
>70% |
Process metrics |
Site Deployment KPIs
| Metric |
Current |
Target |
| New Site Deployment |
8-12 weeks |
<2 weeks |
| Site Onboarding (ZTP) |
Manual |
Automated |
| Policy Deployment |
Hours |
Minutes |
| Template Reuse |
0% |
>90% |
1.8.4 Financial Success Criteria
Cost Reduction KPIs
| Category |
Year 1 |
Year 2 |
Year 3 |
Total |
| MPLS Reduction |
50% |
80% |
100% |
$X,XXX,XXX |
| Operational Savings |
20% |
40% |
50% |
$XXX,XXX |
| Productivity Gains |
1% |
2% |
2.5% |
$XXX,XXX |
| Net Savings |
$XXX,XXX |
$XXX,XXX |
$XXX,XXX |
$X,XXX,XXX |
Financial Milestones
| Milestone |
Target Date |
Criteria |
| First MPLS cancellation |
Month 6 |
2 circuits cancelled |
| 50% MPLS reduction |
Month 12 |
8 circuits cancelled |
| Break-even point |
Month 14 |
Cumulative savings = Investment |
| Full MPLS elimination |
Month 18 |
All MPLS cancelled |
| Target ROI achieved |
Month 36 |
233% ROI confirmed |
1.8.5 Business Success Criteria
User Satisfaction KPIs
| Metric |
Baseline |
Target |
Method |
| Network NPS |
+15 |
>+40 |
Quarterly survey |
| Help Desk Satisfaction |
3.5/5 |
>4.⅖ |
Ticket surveys |
| Application Performance Rating |
3.⅖ |
>4.0/5 |
User surveys |
| Remote Worker Satisfaction |
3.0/5 |
>4.0/5 |
Pulse surveys |
Business Agility KPIs
| Capability |
Current |
Target |
Success Criteria |
| Time to new branch |
8-12 weeks |
<2 weeks |
3 sites deployed in <2 weeks |
| Time to bandwidth change |
4-6 weeks |
Same day |
5 changes completed same day |
| Cloud app onboarding |
2-4 weeks |
<3 days |
O365/SFDC optimized in <3 days |
1.8.6 Phase-Based Success Gates
Phase 1: Foundation (Months 1-3)
| Gate |
Criteria |
Status |
| G1.1 |
Controllers deployed and operational |
Required |
| G1.2 |
Pilot site (Bangalore) live |
Required |
| G1.3 |
SD-Access integration validated |
Required |
| G1.4 |
Team training completed |
Required |
Phase 2: Expansion (Months 4-9)
| Gate |
Criteria |
Status |
| G2.1 |
All India sites migrated |
Required |
| G2.2 |
Cloud OnRamp operational |
Required |
| G2.3 |
First MPLS circuits cancelled |
Required |
| G2.4 |
NOC fully trained |
Required |
Phase 3: Completion (Months 10-18)
| Gate |
Criteria |
Status |
| G3.1 |
All global sites migrated |
Required |
| G3.2 |
All MPLS eliminated |
Required |
| G3.3 |
Target KPIs achieved |
Required |
| G3.4 |
Project formally closed |
Required |
1.8.7 Acceptance Criteria Matrix
Technical Acceptance
| Component |
Acceptance Criteria |
Validation Method |
| SD-WAN Controllers |
99.99% uptime for 30 days |
Monitoring data |
| WAN Edge Routers |
All tunnels established |
vManage dashboard |
| IPsec Tunnels |
<1% tunnel flaps/day |
BFD statistics |
| AAR Policies |
SLA maintained during failover |
Failover testing |
| Cloud OnRamp |
<50ms to SaaS apps |
vAnalytics |
Operational Acceptance
| Process |
Acceptance Criteria |
Validation |
| Monitoring |
All alerts configured |
Test alerts |
| Runbooks |
Documented and tested |
Tabletop exercises |
| DR Procedures |
Successful DR test |
DR drill |
| Change Management |
Templates approved |
Change board |
1.8.8 Success Measurement Dashboard
Executive Dashboard Template
╔═══════════════════════════════════════════════════════════════╗
║ SD-WAN PROJECT SUCCESS DASHBOARD ║
╠═══════════════════════════════════════════════════════════════╣
║ ║
║ OVERALL PROJECT STATUS: ██████████░░░░ 75% Complete ║
║ ║
║ ┌─────────────────┬─────────────────┬─────────────────┐ ║
║ │ TECHNICAL │ FINANCIAL │ BUSINESS │ ║
║ ├─────────────────┼─────────────────┼─────────────────┤ ║
║ │ Availability │ MPLS Reduction │ User NPS │ ║
║ │ ✅ 99.99% │ ✅ 65% │ ⚠️ +32 │ ║
║ │ │ │ │ ║
║ │ Latency │ OpEx Savings │ Time to Site │ ║
║ │ ✅ 18ms │ ✅ $XXXK │ ✅ 10 days │ ║
║ │ │ │ │ ║
║ │ Voice MOS │ ROI Progress │ Agility Score │ ║
║ │ ✅ 4.3 │ ⚠️ 156% │ ✅ 85% │ ║
║ └─────────────────┴─────────────────┴─────────────────┘ ║
║ ║
║ RISKS: 2 Medium | ISSUES: 1 Open | SCHEDULE: On Track ║
╚═══════════════════════════════════════════════════════════════╝
1.8.9 Success Criteria Summary
Critical Success Factors
| Factor |
Weight |
Target |
Minimum Acceptable |
| WAN Availability |
20% |
99.99% |
99.95% |
| Cost Savings (Y1) |
25% |
$XXX,XXX |
$XXX,XXX |
| User Satisfaction |
15% |
NPS +40 |
NPS +25 |
| Deployment Time |
15% |
<2 weeks |
<4 weeks |
| Application Performance |
25% |
All targets met |
80% targets met |
Project Success Definition
The SD-WAN migration project will be considered successful when:
- All 9 sites are migrated and operational on SD-WAN
- WAN availability exceeds 99.95%
- Year 1 cost savings exceed $XXX,XXX
- User satisfaction (NPS) improves by at least 10 points
- All compliance requirements are met
- MPLS circuits are fully eliminated within 18 months
References
| Document |
Description |
| Project Charter |
Success criteria definitions |
| Financial Model |
Cost/benefit calculations |
| User Survey Templates |
Satisfaction measurement |
| Monitoring Specifications |
Technical KPI collection |
Document Version: 1.0
Last Updated: December 2025
Classification: Internal Use Only
Abhavtech.com - SD-WAN Documentation