1.6 SD-WAN Readiness Assessment

Document Information

Item Details
Document Version 1.0
Last Updated December 2025
Author Network Architecture Team
Organization Abhavtech.com
Classification Internal Use Only

1.6.1 Overview

This section provides a comprehensive readiness assessment for Abhavtech.com's migration to Cisco Catalyst SD-WAN. The assessment evaluates technical, operational, and organizational readiness to ensure a successful deployment.

Assessment Methodology

  • Technical infrastructure evaluation
  • Skills and knowledge assessment
  • Process and procedure review
  • Vendor and partner readiness
  • Risk and dependency analysis

Readiness Scoring Legend

Score Status Description
✅ Ready 90-100% No action required
⚠️ Partial 60-89% Minor remediation needed
❌ Not Ready 0-59% Significant work required

1.6.2 Infrastructure Readiness Assessment

Data Center Infrastructure

Component Requirement Current State Gap Status
Compute (vManage) 32 vCPU, 128 GB RAM per node ESXi cluster available None ✅ Ready
Storage (vManage) 2 TB SSD per node vSAN available None ✅ Ready
Network (vManage) 10 GbE connectivity Available None ✅ Ready
Compute (vSmart) 8 vCPU, 16 GB RAM per node ESXi available None ✅ Ready
Compute (vBond) 4 vCPU, 8 GB RAM per node Cloud or on-prem Decision pending ⚠️ Partial
DR Site Chennai DC Infrastructure ready Testing required ⚠️ Partial

SD-WAN Controller Resource Requirements

                    SD-WAN CONTROLLER SIZING
    ═══════════════════════════════════════════════════════════════

    PRODUCTION (Mumbai DC):
    ┌─────────────────────────────────────────────────────────────┐
    │  vManage Cluster (3 nodes)                                  │
    │  ┌─────────┐  ┌─────────┐  ┌─────────┐                     │
    │  │ Node 1  │  │ Node 2  │  │ Node 3  │                     │
    │  │ 32vCPU  │  │ 32vCPU  │  │ 32vCPU  │                     │
    │  │ 128GB   │  │ 128GB   │  │ 128GB   │                     │
    │  │ 2TB SSD │  │ 2TB SSD │  │ 2TB SSD │                     │
    │  └─────────┘  └─────────┘  └─────────┘                     │
    │                                                             │
    │  vSmart Controllers (2 nodes)                               │
    │  ┌─────────┐  ┌─────────┐                                  │
    │  │vSmart-1 │  │vSmart-2 │                                  │
    │  │ 8vCPU   │  │ 8vCPU   │                                  │
    │  │ 16GB    │  │ 16GB    │                                  │
    │  │ 100GB   │  │ 100GB   │                                  │
    │  └─────────┘  └─────────┘                                  │
    └─────────────────────────────────────────────────────────────┘

    DR SITE (Chennai DC):
    ┌─────────────────────────────────────────────────────────────┐
    │  vManage DR (1 node - can scale to cluster)                 │
    │  ┌─────────┐                                                │
    │  │vMng-DR  │  vSmart Controllers (2 nodes)                 │
    │  │ 32vCPU  │  ┌─────────┐  ┌─────────┐                     │
    │  │ 128GB   │  │vSmart-3 │  │vSmart-4 │                     │
    │  │ 2TB SSD │  │ 8vCPU   │  │ 8vCPU   │                     │
    │  └─────────┘  └─────────┘  └─────────┘                     │
    └─────────────────────────────────────────────────────────────┘

    CLOUD (vBond):
    ┌─────────────────────────────────────────────────────────────┐
    │  vBond Validators (2 instances - Cloud)                     │
    │  ┌─────────┐  ┌─────────┐                                  │
    │  │vBond-1  │  │vBond-2  │                                  │
    │  │ 4vCPU   │  │ 4vCPU   │                                  │
    │  │ 8GB     │  │ 8GB     │                                  │
    │  │ AWS     │  │ Azure   │  (Multi-cloud redundancy)        │
    │  └─────────┘  └─────────┘                                  │
    └─────────────────────────────────────────────────────────────┘

WAN Edge Router Readiness

Site Current Router SD-WAN Ready Action Required Status
Mumbai-R1 ISR4451-X Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
Mumbai-R2 ISR4451-X Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
Chennai-R1 ISR4351 Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
Chennai-R2 ISR4351 Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
Bangalore-R1 ISR4331 Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
Delhi-R1 ISR4331 Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
Noida-R1 ISR4331 Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
London-R1/R2 ISR4351 Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
Frankfurt-R1/R2 ISR4351 Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
New Jersey-R1/R2 ISR4451-X Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial
Dallas-R1/R2 ISR4351 Yes (controller mode) Upgrade to 17.15.x ⚠️ Partial

New Hardware Requirements

Site Recommended Model Quantity Purpose Status
Mumbai C8500-12X4QC 2 DC aggregation ❌ To order
Chennai C8500-12X4QC 2 DR aggregation ❌ To order
All Hubs C8300-2N2S-6T 8 Hub sites ❌ To order
Branches C8200L-1N-4T 6 Branch sites ❌ To order

1.6.3 Network Readiness Assessment

Connectivity Prerequisites

Requirement Status Notes
Internet connectivity at all sites ✅ Ready 10 sites covered
Public IP addresses for vBond ⚠️ Partial Need 2 public IPs per DC
DNS resolution for controller FQDNs ✅ Ready Infoblox configured
NTP synchronization ✅ Ready All sites synced
Firewall rules for SD-WAN ❌ Not Ready Ports need opening

Required Firewall Rules

Source Destination Port Protocol Purpose
WAN Edge vBond 12346 UDP DTLS control
WAN Edge vSmart 12346 UDP DTLS control
WAN Edge vManage 443 TCP HTTPS management
WAN Edge WAN Edge 12346 UDP IPsec data plane
WAN Edge WAN Edge 12346 TCP TCP fallback
Admin vManage 443 TCP Web UI
Admin vManage 8443 TCP API

SD-Access Integration Readiness

Component Status Notes
Border nodes configured ✅ Ready L3 handoff interfaces ready
VRF-Lite subinterfaces ⚠️ Partial Need SD-WAN side config
BGP peering prepared ✅ Ready eBGP AS numbers allocated
SGT inline tagging ⚠️ Partial CTS manual needed on WAN Edge
Route filtering prepared ✅ Ready Prefix lists defined

1.6.4 Technical Skills Assessment

Team Capability Matrix

Skill Area Current Level Required Level Gap Remediation
Cisco SD-WAN Architecture Basic Advanced Significant Training required
vManage Administration None Advanced Critical Training + lab
SD-WAN Policies (AAR, QoS) Basic Advanced Significant Training required
SD-WAN Troubleshooting None Intermediate Significant Training + practice
SD-Access Integration Intermediate Advanced Moderate Workshop
Python/API Automation Intermediate Advanced Moderate Self-study
Terraform/Ansible Basic Intermediate Moderate Training
Course Provider Duration Priority Team Members
ENSDWI (Implementing Cisco SD-WAN) Cisco 5 days High 4 engineers
SD-WAN Design Workshop Cisco 3 days High 2 architects
SD-WAN Operations Cisco 3 days Medium 3 operators
SD-Access/SD-WAN Integration Cisco 2 days High 2 engineers
DevNet SD-WAN Automation Cisco 3 days Medium 2 engineers

Training Timeline

                    TRAINING SCHEDULE
    ═══════════════════════════════════════════════════════════════

    MONTH 1:
    Week 1-2:  ████████████████ ENSDWI Course (Team A)
    Week 3:    ████████ SD-WAN Design Workshop
    Week 4:    ████████ Lab Practice

    MONTH 2:
    Week 1-2:  ████████████████ ENSDWI Course (Team B)
    Week 3:    ████████ SD-Access Integration Workshop
    Week 4:    ████████ Lab Practice

    MONTH 3:
    Week 1:    ████ Operations Training
    Week 2-3:  ████████████ DevNet Automation
    Week 4:    ████████ Final Certification Prep
    ═══════════════════════════════════════════════════════════════

1.6.5 Operational Readiness Assessment

Process Readiness

Process Current State Required State Gap Status
Change Management Mature (ITIL) SD-WAN specific templates Minor ⚠️ Partial
Incident Management Mature SD-WAN runbooks Moderate ⚠️ Partial
Problem Management Mature SD-WAN RCA procedures Minor ⚠️ Partial
Configuration Management Basic IaC with GitOps Significant ❌ Not Ready
Capacity Management Basic vAnalytics integration Moderate ⚠️ Partial
Monitoring/Alerting SolarWinds vManage + SolarWinds Moderate ⚠️ Partial

Documentation Requirements

Document Status Priority
SD-WAN Architecture Design In progress High
SD-WAN Operations Runbook Not started High
SD-WAN Troubleshooting Guide Not started High
SD-WAN Change Templates Not started Medium
SD-WAN DR Procedures Not started High
SD-WAN Security Policies In progress High

1.6.6 Vendor and Licensing Readiness

Cisco Licensing Requirements

License Type Quantity Duration Status
DNA Advantage for WAN Edge 15 devices 3 years ❌ To procure
vManage License 1 cluster 3 years ❌ To procure
Umbrella DNS Security 3,000 users 1 year ✅ Existing
ThousandEyes 10 agents 1 year ❌ To procure
ISE Advantage Existing Existing ✅ Ready

Licensing Cost Estimate

Component Annual Cost 3-Year Total
DNA Advantage (15 devices) $XX,XXX $XXX,XXX
vManage + vSmart $XX,XXX $XX,XXX
ThousandEyes $XX,XXX $XX,XXX
Support (SmartNet) $XX,XXX $XX,XXX
Total $XXX,XXX $XXX,XXX

Partner/Vendor Support

Partner Role Status
Cisco Account Team Primary vendor ✅ Engaged
Cisco Partner (Integrator) Implementation support ⚠️ Evaluation
Cisco TAC Technical support ✅ SmartNet active
Cisco CX Success services ⚠️ Proposal pending

1.6.7 Risk Assessment

Technical Risks

Risk Probability Impact Mitigation Owner
Controller deployment complexity Medium High Cisco CX engagement Architect
SD-Access integration issues Medium High Detailed design, lab testing Network Team
Performance degradation during migration Medium Medium Parallel operation, staged rollout Operations
Cellular failover reliability Low Medium Multiple carriers, testing Network Team
Certificate management complexity Medium Medium Enterprise PKI integration Security

Organizational Risks

Risk Probability Impact Mitigation Owner
Skills gap delays deployment High High Accelerated training program Manager
Resource constraints Medium High Partner augmentation PMO
Change resistance Low Medium Communication, training Leadership
Parallel project conflicts Medium Medium Resource planning, prioritization PMO

1.6.8 Readiness Gap Remediation Plan

Critical Gaps (Must Fix Before Deployment)

Gap Remediation Action Owner Timeline Status
Controller VM deployment Deploy vManage/vSmart/vBond Infrastructure Week 1-2 Planned
WAN Edge IOS upgrade Upgrade to 17.15.x Network Week 2-4 Planned
Firewall rules Open SD-WAN ports Security Week 1 Planned
Team training Complete ENSDWI course HR/Training Month 1-2 Planned
Licensing procurement Purchase DNA licenses Procurement Week 1 In Progress

Medium Priority Gaps

Gap Remediation Action Owner Timeline
New hardware procurement Order C8300/C8500 Procurement Month 1
Operations runbooks Develop SD-WAN runbooks Operations Month 2-3
Monitoring integration Configure vManage alerts NOC Month 2
DR procedures Document and test DR Operations Month 3

Low Priority Gaps

Gap Remediation Action Owner Timeline
GitOps implementation Implement config-as-code DevOps Month 4-6
Advanced automation Python SDK scripts Automation Month 4-6
ThousandEyes deployment Deploy agents Network Month 3-4

1.6.9 Readiness Assessment Summary

Overall Readiness Score

                    READINESS ASSESSMENT SUMMARY
    ═══════════════════════════════════════════════════════════════

    CATEGORY                    SCORE    STATUS
    ─────────────────────────────────────────────────────────────
    Infrastructure              75%      ⚠️ Partial
    Network Connectivity        80%      ⚠️ Partial
    Technical Skills            55%      ❌ Not Ready
    Operational Processes       65%      ⚠️ Partial
    Vendor/Licensing            60%      ⚠️ Partial
    Documentation               40%      ❌ Not Ready
    ─────────────────────────────────────────────────────────────
    OVERALL READINESS           62%      ⚠️ Partial

    ═══════════════════════════════════════════════════════════════

    RECOMMENDATION: Proceed with 8-week readiness phase before
                   production deployment begins.

Readiness Phase Timeline

Week Activities Exit Criteria
1-2 Licensing, firewall rules, DNS Controllers deployable
3-4 Controller deployment, training start vManage operational
5-6 Lab environment, training complete Team certified
7-8 Pilot site preparation, runbooks Ready for pilot

Go/No-Go Criteria

Criterion Required State Current State Go/No-Go
Controllers deployed Operational Not deployed No-Go
Team trained 80% certified 0% certified No-Go
Firewall rules Implemented Not implemented No-Go
Licenses procured Available In procurement No-Go
Lab validated Complete Not started No-Go
Runbooks documented Draft complete Not started No-Go

References

Document Description
Cisco SD-WAN Deployment Prerequisites Official requirements
Abhavtech IT Skills Matrix Current team capabilities
Project Resource Plan Staffing and training
Procurement Pipeline License and hardware status

Document Version: 1.0 Last Updated: December 2025 Classification: Internal Use Only Abhavtech.com - SD-WAN Documentation